Requests Disappear into Inboxes
A resident calls, a councilor emails, a crew leader sees something on a route. Each one is a different path to a different person, and nobody can say what is still open.
Switchback Gov runs the field and facilities side of cities, counties, special districts and utilities: crews and fleets, work orders and asset maintenance, permit and request intake, certifications, and capital projects, with dashboards for your council and the public. When a lift station alarms at 02:10, a license is about to lapse or a grant milestone slips, the right person sees it and owns the next step. Public safety agencies are served by Switchback Ops.
Then a lift station alarmed, two operators were out and a council member asked for the status of a grant-funded project. At a lean public works department the director, the superintendent and the clerk run on radios, a spreadsheet and the memory of the person who has been there longest. When that person retires, the system retires with them.
A resident calls, a councilor emails, a crew leader sees something on a route. Each one is a different path to a different person, and nobody can say what is still open.
Which hydrants were flushed, which truck is due for service, which signal had the last repair: the answer is in a binder or in one person, until that one is out.
A grant report, a council packet or an audit request means weeks pulling numbers from five places, and the project milestone you needed was missed a month ago.
Seven connected suites under one login. Start with the one that hurts most, usually work orders or requests intake, and turn on the rest when you are ready.
Public works, parks, water and wastewater crews against the coverage each shift needs, with fleet and equipment assigned, certifications checked and on-call and storm rotations on the record.
02Hydrants, lift stations, signals, vehicles, buildings and playgrounds on preventive schedules. A request becomes a work order with an owner, a due date and a cost history.
03Resident requests, internal requests and permit-related inspections arrive in one queue, are routed to an owner, and are tracked to closure with a status the requester can see.
04CDL, backflow, wastewater and water operator licenses, flagger, confined-space and safety training by person, with expiry dates, reminders and e-signed records.
05A view of the work and projects you choose to share with a council, board or the public: milestones, budgets, response times and progress, with the detail you decide to expose.
06A dashboard per role for the director, the superintendent and the crew leader, with alerts when requests, inspections or PM slip past due.
07Grant-funded build-outs, capital projects and council reporting as projects: tasks, dependencies, budgets and milestones on a Gantt chart tied to the crews and work orders underneath.
The director, the superintendent and each crew leader see requests, work orders, fleet, certifications and projects without a round of radio calls. When something changes, the board changes with it.
Illustrations with fictional data, not product screenshots.
Plain statements, each one checkable on this site, instead of logos and quotes we do not have.
Every request, inspection, repair and decision is created in the flow of work, so the record an auditor, grantor or council asks for is already there and says who did what and when.
911 centers, police, fire and EMS are served by Switchback Ops, built around their certification and records rules. Gov covers the rest of the department.
Council, board and public views show only the projects and reports you expose, at the level of detail you choose.
A status table that says what is built, what is in progress and what we do not hold. No certification claims we cannot back, including no FedRAMP or StateRAMP claim.
Switchback MES, Ops and Gov share one platform, so the work order, certification and project engine has already been shaped by demanding operations.
The walkthrough runs on a made-up city, so you see real software with no real resident or employee data.
It does not show up as a budget line. It shows up as leaders on the radio instead of in the field, deferred maintenance that comes due all at once, and a director who learns about a missed milestone at the council meeting.
A pump or a truck that was “about due” fails in a storm, and the repair costs more than the preventive work would have.
Triage, callbacks and who-has-this questions fill the day of the people who should be planning the work.
When a grantor or auditor asks for what was built, when and at what cost, can anyone show it without a month of digging?
The routes, the quirks and the history that live in one veteran’s head are the hardest assets you own to replace.
Storms, outages and failed equipment: re-routes measured in minutes, not number of meetings.
Every turn gains ground. One system, no double entry.
Who has it, current state, and next step.
We'll walk through crews, work orders, requests and projects live, then talk through your departments, assets and the problems you want gone first.
Or email info@switchbackgov.com